Mannheim Power Plant, GRP Pipes, Fiberpipe, Piping Systems

OVERVIEW:

  • Client: Großkraftwerk Mannheim AG (GKM)

  • Industry: Energy Sector

  • Project Goal: Ongoing deliveries and repairs for the flue gas desulfurization system (FGD)

  • Solution: ISO-compliant GRP piping systems and components

  • Results: Minimized downtime, increased operational efficiency, long-term partnership

Repairs and Modifications During Ongoing Operations

ISO-Compliant GRP Piping Systems for Rapid Availability

Long-Term Collaboration for Flexible Solutions

Efficient Repairs and Improved Operational Safety

  • Minimized Downtime: Repairs were completed swiftly without delays.

  • Long-Term Partnership: Close collaboration ensured flexible and reliable support.

  • High Efficiency: Compatible piping systems simplified installation and reduced costs.

Feedback from Our Clients

quotes icons

For over 20 years, Fiberpipe has been our trusted partner for GRP products. Always approachable, consistently innovative, and backed by excellent service.

quotes icons

For over 20 years, Fiberpipe has been a reliable partner for our water and wastewater treatment projects.