4. November 2024
Efficient Wastewater Pipeline Rehabilitation for the Miro Refinery Oberrhein

Content
OVERVIEW:
Client: Miro Refinery Oberrhein, Karlsruhe
Industry: Oil Refinery
Project Goal: Rehabilitate wastewater pipelines with high corrosion and pressure requirements
Solution: Custom GRP pipes for wastewater transport at high temperatures
Results: Improved operational safety, long-lasting solution, high customer satisfaction
Challenge
Corrosion-Resistant and Pressure-Resistant Pipe Systems for a Modern Refinery
Miro Refinery Oberrhein, Germany’s largest fuel refinery, planned the rehabilitation of its wastewater system. The existing pipelines needed replacement as they could no longer withstand the extreme stresses from temperature, pressure, and chemical corrosion. Additionally, the construction period had to be minimized to reduce operational disruptions.
Solution
Custom GRP Pipes with High Durability
Fiberpipe developed a GRP pipe system designed to meet both chemical and thermal requirements. The pipes were engineered to handle temperatures up to 125°C and pressures up to 16 bar. Through precise planning and the delivery of fully prefabricated components, the installation was carried out efficiently and accurately.
Process
Planning and Execution from a Single Source
In close collaboration with Miro Refinery, Fiberpipe analyzed the requirements for the new pipelines. In addition to material selection and the creation of a detailed installation plan, Fiberpipe also carried out on-site installation. The team coordinated all steps from manufacturing to assembly to ensure a smooth process.
Results
Sustainable Piping Systems for Maximum Operational Safety
The new GRP pipes provide Miro Refinery with a long-lasting solution capable of meeting the demands of challenging wastewater management. With high corrosion resistance and pressure durability, operational safety has been significantly improved.
Durable Materials: The GRP system withstands high temperatures and aggressive media.
Minimized Downtime: Precise planning and prefabrication enabled quick installation.
High Customer Satisfaction: The collaboration was successfully completed on time and within budget.
Want to Learn More About Our GRP Solutions?
Testimonials
Feedback from Our Clients
For over 20 years, Fiberpipe has been our trusted partner for GRP products. Always approachable, consistently innovative, and backed by excellent service.
Klaus Grammlich
K+S Aktiengesellschaft
For over 20 years, Fiberpipe has been a reliable partner for our water and wastewater treatment projects.
Anke Eisemann
INVENT Environmental and Process Technology