RWE Coal Power Plant, Fiberpipe, GRP Pipe

OVERVIEW:

  • Client: RWE Ibbenbüren

  • Industry: Energy Sector

  • Project Goal: Retrofit raw gas preheating to improve efficiency

  • Solution: GRP pipes with high temperature resistance and chemical protection

  • Results: Minimized heat losses, enhanced operational safety, short downtime

Optimizing Raw Gas Preheating Under Extreme Conditions

GRP Pipes with Chemical Protection Layer and High Temperature Resistance

Precise Planning and On-Time Implementation

Increased Efficiency and Reduced Maintenance Costs

  • Minimized Heat Losses: The highly insulating properties of the pipes reduced energy loss.

  • Cost Efficiency: Prefabrication and rapid installation minimized downtime and reduced project costs.

  • Sustainability: Durable GRP materials required less maintenance and fewer replacements.

Feedback from Our Clients

quotes icons

For over 20 years, Fiberpipe has been our trusted partner for GRP products. Always approachable, consistently innovative, and backed by excellent service.

quotes icons

For over 20 years, Fiberpipe has been a reliable partner for our water and wastewater treatment projects.