GRP Pipes, Enertec Hameln, Cooling Water Cycle

OVERVIEW:

  • Client: Enertec Hameln

  • Industry: Energy Sector

  • Project Goal: Expand capacity by renewing the cooling water cycle

  • Solution: Pressure-resistant GRP pipes with an innovative push-fit connection system

  • Results: Reduced installation time, minimized downtime, improved operational efficiency

Replacing the Cooling Water Cycle with Maximum Time and Cost Efficiency

Innovative GRP Pipe System with Push-Fit Connection

Precise Planning and Fast Implementation

Improved Efficiency and Reduced Installation Costs

  • Reduced Installation Time: The push-fit system cut installation time by 80%.

  • Minimized Downtime: The retrofit was completed as planned within just five days.

  • Sustainability: Durable materials reduced maintenance intervals and increased operational safety.

Feedback from Our Clients

quotes icons

For over 20 years, Fiberpipe has been our trusted partner for GRP products. Always approachable, consistently innovative, and backed by excellent service.

quotes icons

For over 20 years, Fiberpipe has been a reliable partner for our water and wastewater treatment projects.